CRA, Magnum Minerals & Placer Exploration (1987–1996)
CRA Exploration completed regional stream-sediment sampling during 1987–1988, discovering a 7.5 g/t Au float sample from the Logaiyu River, providing the first indication of an upstream gold source. Magnum Minerals followed with reconnaissance exploration between 1988 and 1989. In 1995, Placer Exploration, on behalf of the Porgera Extended Joint Venture, completed the first focused exploration programme at Kili Teke, including:
- Geological mapping
- Stream sediment sampling
- Rock-chip sampling
- Petrographic analysis
Aldridge Minerals (2009–2012)
Aldridge Minerals completed the first targeted exploration campaign, including rock-chip and soil sampling together with an Induced Polarisation (IP) geophysical survey in June 2011. Between August 2011 and January 2012, the company completed three diamond drill holes (KT001–KT003) totaling 596.6 metres. Two of the three holes successfully confirmed copper-gold porphyry and skarn mineralization.
Harmony Gold Exploration (2014–2017)
Harmony Gold, through its wholly owned PNG subsidiary, was granted Exploration Licence EL 2310 on 24 May 2014. Harmony subsequently completed the most comprehensive exploration programme ever undertaken at Kili Teke, investing approximately US$20 million.
Surface Work Programme (2014)
Prior to drilling, Harmony completed an intensive field programme:
- 1,674 surface geochemical samples (17 stream sediment, 17 BLEG, 15 pan concentrate, 22 channel, 115 float rock chip, 436 in-situ rock chip, 1,052 soil)
- Detailed geological mapping over 8 km²
- Regional helicopter-borne aeromagnetics and radiometrics survey (480 line-km at 50–100 m line spacing)
This programme defined four primary drill targets: the Central Mineralised Porphyry (CMP), the Transfer Zone Porphyry (TZP), the Ridge Gold Anomaly (RGA), and the Ieru Porphyry (IP).
Drilling Programme (2014–2017)
Three separate drilling campaigns at the CMP, each culminating in a resource update, plus reconnaissance drilling at peripheral targets.
For more information, see NI 43-101 Technical Report on the Kili Teke Cu-Au Project, Papua New Guinea, effective date: November 18, 2022